Located in a coastal location, this was a conversion of an existing 3 storey concrete frame building into 9 townhouses. Frameclad provided the SFS infill to form new external walls to the existing levels then added a self-supporting top floor with SFS to give additional floor space to the scheme. Due to the restrictive nature of the site and the need to keep the new loadings of the upper floor to a minimum, SFS was the ideal solution for the developer.
Product: Load bearing frames & SFS infil
Site: Coastal Location
Main Contractor:
Client:
Materials: 70mm, 150mm and 200mm sections
Area: 2000m²
Floors: 3
Status: Complete